« Monuments are the living stones of history. »
Chateaubriand's signature

The château needs you.

Donate now

For centuries, the Château de Combourg has protected Brittany. Today, it is our turn to protect it from time.

25+Years of works
30+Projects completed
2,5 M€Total cost of works

Preserving our roots means securing our future!

Donate now
Tax benefits
66 % Individuals

Income tax deduction.
A €100 donation only costs €34.

60 % Companies

Corporate tax deduction.
A €1,000 donation only costs €400.

Your donations are collected and managed by Demeure Historique, a public benefit organisation. It oversees and controls all donations, pays restoration contractors directly, and thus guarantees that every euro donated is allocated to identified restoration projects.

2026
A decisive year

Recent surveys have revealed serious and worsening structural issues: persistent water infiltration, advanced degradation of load-bearing timber, and active fungal decay.

Vue en coupe du Chateau de Combourg

Cross-section of the château — areas requiring urgent intervention

Three decades of restoration

Year after year, stone by stone, the château comes back to life.

Donate now
2025–26Emergency works — Three simultaneous projects: Grand Staircase false attic (timber frame, roofing, anti-dry-rot fungal treatment, chimneys) East wall-walk (complete waterproofing overhaul, active infiltration) South curtain wall (emergency structural shoring, risk of ceiling collapse in the La Rochetaillée bedroom). Installation of a dry riser (exceptionally rare for a castle).
2024Library restoration
2023Hermine Room and Sybil Tower
2022Chapel. René-Auguste’s study (2nd phase). South and west rampart waterproofing.
2021Grand Salon. Chateaubriand’s father’s study (1st phase).
2020Dining room (former Guards’ Hall)
2019Vestibule with pointed vaults
2017–18Wall paintings, 1st and 2nd floors. Inner courtyard.
2015–16Crusader Tower roofing
2013–14East rampart waterproofing. Painted décor, 19th-century ceilings. Plaster, flashings, stained glass.
2010–11Moor Tower and East Tower roofing
2006–08South wing and north wing roofing
2004–05Timber frame, beam reinforcement, wall-walk masonry
2002–03Cat Tower roofing. Joinery repairs.
2001North-west and south-west chimney stack repairs
Studies & surveys

Preparing tomorrow's projects.

2025
Emergency works study
Priority
2024
Roofing & façade survey
Ongoing
2023
Full diagnostic study
Ongoing
2015
Crusader Tower
Completed
2007
Architectural project — Moor Tower
Completed
Donate now
Institutional partners
0
Passer au contenu
Accueil
Château & Parc
Chateaubriand
Légendes
Nous soutenir
Galerie
Évènements
Prix Littéraire
Expositions
Le Voyageur Café
Votre Visite
Privatisation
Contact
Home
Castle & Park
Chateaubriand
Legends
Support Us
Gallery
Events
Literary Prize
Exhibitions
The Voyageur Café
Your Visit
Privatisation
Contact
Français
English
COMBOURG
Accueil
Château & Parc
Chateaubriand
Légendes
Nous soutenir
Galerie
Évènements
Prix Littéraire
Expositions
Le Voyageur Café
Votre Visite
Privatisation
Contact
Home
Castle & Park
Chateaubriand
Legends
Support Us
Gallery
Events
Literary Prize
Exhibitions
The Voyageur Café
Your Visit
Privatisation
Contact
Français
English
COMBOURG
Accueil
Château & Parc
Chateaubriand
Légendes
Nous soutenir
Galerie
Évènements
Prix Littéraire
Expositions
Le Voyageur Café
Votre Visite
Privatisation
Contact
Home
Castle & Park
Chateaubriand
Legends
Support Us
Gallery
Events
Literary Prize
Exhibitions
The Voyageur Café
Your Visit
Privatisation
Contact
Français
English

Contact   Votre visite   Liens